APR Engineer
- Perform Netlist-to-GDS design flow, including floor planning, placement optimization, clock tree synthesis and routing.
- Support STA timing analysis and fixing.
- Perform physical verification, including DRC, LVS, IR drop analysis
The Gold Card Office will be closed on 10/24 in observance of Taiwan Retrocession Day.